Construction Progress

Fire Station #5

ACHIEVEMENTS:

  • Sprung Structure Grading
  • Temp Station Submittals
  • Domestic Water Line
  • UG Power Line
  • Sanitary Sewer Line
  • Fire 5 Erosion Control/Watershed Inspection
  • Temp Station Flex base
  • Sprung Foundation
  • Install Sprung Structure

NEXT STEPS:

  • Install OH Doors
  • Install Electric Underground Feed from Transformer
  • Install Sanitary Temp (In-Process)
  • Install Concrete Pads for Generator and Riser Room
  • Temp Station Interior MEP


Fire Station #6


ACHIEVEMENTS:

  • 100% Piers Complete
  • Grade Beams (Apparatus Bay) Complete
  • Grade Beams (Operations Side) Formed
  • South Storm Sewer 50%
  • Pour Grade Beams (Operations Side)
  • Start Storm Sewer Install

NEXT STEPS:

  • Excavate & Install Water Line
  • Excavate & Install Storm Line
  • Excavate & Install Gas Line
  • Excavate & Install Power Line
  • Underground MEP (Bay and Ops)
  • Pour Slab