November

After careful consideration, this project's scope of work has been revised to include a continuous 5-foot-wide sidewalk in lieu of the originally proposed 10' sidewalk along the south side of McKinney St. to help expedite the construction of the sidewalk. A revised 30% plan set is presently under design.

Share November on Facebook Share November on Twitter Share November on Linkedin Email November link
#<Object:0x00000000296cc428>