This project consists of full depth reconstruction of 21 street segments within the NBHD-1A project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes limited sidewalk improvements, and street lighting. Following is a summary of key scope items:

  • Street Reconstruction – Approx. 8,000 linear feet
  • Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development
  • Sidewalks – Limited improvements as determined during design development
  • Streetlights – Limited improvements as determined by lighting study




The street segments include Meadow Lane Place, Meadow Lane, Plum Hollow Street, Tanglewood Street, Pheasant Hollow Street, Willow Stone Street, Pear Tree Place, Windbrook St., and Windbrook Court.

STREET SEGMENT

FROM

TO

STREET SEGMENT

FROM

TO

Meadow

Sagewood St

Meadow Lane Pl

Pheasant Hollow

Willow Stone

Brook Hollow E

Meadow

Pheasant Hollow St

Sagewood St

Pheasant Hollow

Plum Hollow

Willow Stone

Meadow

Meadow Lane Pl

Shadow Tr

Plum Hollow

Sagewood

Shadow Tr

Meadow Lane E

Hercules Ln

Meadow Ln

Plum Hollow

Locust N

Pheasant Hollow

Meadow Lane W

Hercules Ln

Meadow Ln

Tanglewood

Locust N

Pheasant Hollow

Pear Tree

Sagewood

Shadow Tr

Tanglewood

Sagewood

Shadow Tr

Pear Tree

Pheasant Hollow

Sagewood

Willow Stone

Sagewood

Shadow Tr

Pheasant Hollow

Meadow

Plum Hollow

Windbrook

Windbrook

North

Pheasant Hollow

Brook Hollow E

Pear Tree Pl

Windbrook

Pheasant Hollow

Windbrook Ct

Pheasant Hollow

Pear Tree Pl

Windbrook

Windbrook

Windbrook Ct

Shadow Tr


Willow Stone

Sagewood

Pheasant Hollow



This project consists of full depth reconstruction of 21 street segments within the NBHD-1A project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes limited sidewalk improvements, and street lighting. Following is a summary of key scope items:

  • Street Reconstruction – Approx. 8,000 linear feet
  • Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development
  • Sidewalks – Limited improvements as determined during design development
  • Streetlights – Limited improvements as determined by lighting study




The street segments include Meadow Lane Place, Meadow Lane, Plum Hollow Street, Tanglewood Street, Pheasant Hollow Street, Willow Stone Street, Pear Tree Place, Windbrook St., and Windbrook Court.

STREET SEGMENT

FROM

TO

STREET SEGMENT

FROM

TO

Meadow

Sagewood St

Meadow Lane Pl

Pheasant Hollow

Willow Stone

Brook Hollow E

Meadow

Pheasant Hollow St

Sagewood St

Pheasant Hollow

Plum Hollow

Willow Stone

Meadow

Meadow Lane Pl

Shadow Tr

Plum Hollow

Sagewood

Shadow Tr

Meadow Lane E

Hercules Ln

Meadow Ln

Plum Hollow

Locust N

Pheasant Hollow

Meadow Lane W

Hercules Ln

Meadow Ln

Tanglewood

Locust N

Pheasant Hollow

Pear Tree

Sagewood

Shadow Tr

Tanglewood

Sagewood

Shadow Tr

Pear Tree

Pheasant Hollow

Sagewood

Willow Stone

Sagewood

Shadow Tr

Pheasant Hollow

Meadow

Plum Hollow

Windbrook

Windbrook

North

Pheasant Hollow

Brook Hollow E

Pear Tree Pl

Windbrook

Pheasant Hollow

Windbrook Ct

Pheasant Hollow

Pear Tree Pl

Windbrook

Windbrook

Windbrook Ct

Shadow Tr


Willow Stone

Sagewood

Pheasant Hollow



  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Punch list items are being complete and project is currently in closeout.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Project is approaching substantial completion. Roadwork is complete, remaining sidewalk and sod is currently being installed.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on Meadow Lane Place from Hercules Ln to Meadow Ln. Anticipate crews in the area with changing traffic patterns.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on Meadow Ln from Sagewood St to Shadow Trail and Meadow Lane Place from Hercules Ln to Meadow Ln. Anticipate crews in the area with changing traffic patterns.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on the North end of Pheasant Hollow St from Willow Stone St to Sagewood St and Plum Hollow
    St from Locust St to Pheasant Hollow St. Anticipate crews in the area with changing traffic patterns.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on Pheasant Hollow St from Windbrook St to Willow Stone St and Tanglewood St from Locust St to Pheasant Hollow St. Anticipate crews in the area with changing traffic patterns.

    Construction will commence on Pheasant Hollow St from Willow Stone St to Sagewood St and Plum Hollow St from Locust to Pheasant Hollow St once the south leg of Pheasant Hollow is complete.

    The top layer of asphalt has been placed on Plum Hollow St, Tanglewood St and Windbrook Ct with Willow Stone St, Pear Tree Pl and Windbrook St following shortly.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on Windbrook St with Pheasant Hollow St following shortly after. Anticipate crews in the area with changing traffic patterns.

    The top layer of asphalt will be placed on Plum Hollow St, Willow Stone St, Tanglewood St, Windbrook Ct and Windbrook St once the sidewalk identified to be replaced is constructed and finished.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on Pear Tree Pl with Windbrook St following shortly after. Anticipate crews in the area with changing traffic patterns.

    The top layer of asphalt will be placed on Plum Hollow St, Willow Stone St, Tanglewood St, and Windbrook Ct once the sidewalk identified to be replaced is constructed and finished.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction is currently underway on Plum Hollow St, Willow Stone St, Tanglewood St, and Windbrook Ct. Anticipate crews in the area with changing traffic patterms.

  • Project Update

    Share on Facebook Share on Twitter Share on Linkedin Email this link

    Construction will start May 30, 2023 for the Neighborhood 1A Project.

    Expect to see crews in the area along with road closures with changing traffic patterns.