The Northwest Water Transmission Main Project is identified within the City of Denton Water Distribution Master Plan. The transmission main will serve to efficiently deliver water from the 2.0 MG Riney Road Elevated Storage Tank to the 1.0 MG Northwest Elevated Storage Tank. As community development continues towards the northwest, the water transmission main will ensure water quality standards are met and reduce the tank fill time of the Northwest Elevated Storage Tank.


The project will consist of the construction of nearly 2 miles of 36-inch water main along the designated project alignment. Along the way, the water main will connect to smaller diameter water lines of 30-inch, 24-inch, 16-inch, 12-inch and 8-inch.

The Northwest Water Transmission Main Project is identified within the City of Denton Water Distribution Master Plan. The transmission main will serve to efficiently deliver water from the 2.0 MG Riney Road Elevated Storage Tank to the 1.0 MG Northwest Elevated Storage Tank. As community development continues towards the northwest, the water transmission main will ensure water quality standards are met and reduce the tank fill time of the Northwest Elevated Storage Tank.


The project will consist of the construction of nearly 2 miles of 36-inch water main along the designated project alignment. Along the way, the water main will connect to smaller diameter water lines of 30-inch, 24-inch, 16-inch, 12-inch and 8-inch.

  • Three water line tie-ins completed in March and April of 2024!

    Share Three water line tie-ins completed in March and April of 2024! on Facebook Share Three water line tie-ins completed in March and April of 2024! on Twitter Share Three water line tie-ins completed in March and April of 2024! on Linkedin Email Three water line tie-ins completed in March and April of 2024! link

    The Contractor successfully tied in the new Northwest Water Transmission Line at (3) key locations. Coordination between the City of Krum, City of Sanger, the Water Department and the Contractor to accomplish the task at hand.

  • The Construction Project is 80% complete.

    Share The Construction Project is 80% complete. on Facebook Share The Construction Project is 80% complete. on Twitter Share The Construction Project is 80% complete. on Linkedin Email The Construction Project is 80% complete. link

    Mountain Cascade of Texas continues to install the transmission water line is now 80% complete with the project.

  • First Coordination Meeting to discuss water shutdowns and tie-ins held this week.

    Share First Coordination Meeting to discuss water shutdowns and tie-ins held this week. on Facebook Share First Coordination Meeting to discuss water shutdowns and tie-ins held this week. on Twitter Share First Coordination Meeting to discuss water shutdowns and tie-ins held this week. on Linkedin Email First Coordination Meeting to discuss water shutdowns and tie-ins held this week. link

    Consultant Engineer held the first coordination meeting to discuss the upcoming water shutdowns and tie-ins affecting the City of Krum and City of Sanger feeds.

  • The installation of the main distribution waterline continues.

    Share The installation of the main distribution waterline continues. on Facebook Share The installation of the main distribution waterline continues. on Twitter Share The installation of the main distribution waterline continues. on Linkedin Email The installation of the main distribution waterline continues. link

    The Contractor continues to install the 36-inch water line. The project is now approximately 60% complete.

  • Contractor is installing the main distribution line.

    Share Contractor is installing the main distribution line. on Facebook Share Contractor is installing the main distribution line. on Twitter Share Contractor is installing the main distribution line. on Linkedin Email Contractor is installing the main distribution line. link

    The Contractor is in the process of installing the main distribution line along Loop 288 & US 77. The project is 30% complete.

  • Contractor has installed Water Line D

    Share Contractor has installed Water Line D on Facebook Share Contractor has installed Water Line D on Twitter Share Contractor has installed Water Line D on Linkedin Email Contractor has installed Water Line D link

    The Contractor has completed installing Water Line D. Water Line D is 16-inch diameter pipe and 2,250 linear feet in length and made of ductile iron.

  • Contractor to Mobilize

    Share Contractor to Mobilize on Facebook Share Contractor to Mobilize on Twitter Share Contractor to Mobilize on Linkedin Email Contractor to Mobilize link

    On March 27, 2023, the Contractor, Mountain Cascade of Texas, LLC, will begin to mobilize into the work area. Contractor will begin the construction staking, setup erosion control and setup temporary fencing.

  • Contract Award

    Share Contract Award on Facebook Share Contract Award on Twitter Share Contract Award on Linkedin Email Contract Award link

    On December 13, 2022, The City of Denton awarded a contract to Mountain Cascade of Texas, LLC to construct the Northwest Water Transmission Main Project.