The Northwest Water Transmission Main Project is identified within the City of Denton Water Distribution Master Plan. The transmission main will serve to efficiently deliver water from the 2.0 MG Riney Road Elevated Storage Tank to the 1.0 MG Northwest Elevated Storage Tank. As community development continues towards the northwest, the water transmission main will ensure water quality standards are met and reduce the tank fill time of the Northwest Elevated Storage Tank.
The project will consist of the construction of nearly 2 miles of 36-inch water main along the designated project alignment. Along the way, the water main will connect to smaller diameter water lines of 30-inch, 24-inch, 16-inch, 12-inch and 8-inch.
The Northwest Water Transmission Main Project is identified within the City of Denton Water Distribution Master Plan. The transmission main will serve to efficiently deliver water from the 2.0 MG Riney Road Elevated Storage Tank to the 1.0 MG Northwest Elevated Storage Tank. As community development continues towards the northwest, the water transmission main will ensure water quality standards are met and reduce the tank fill time of the Northwest Elevated Storage Tank.
The project will consist of the construction of nearly 2 miles of 36-inch water main along the designated project alignment. Along the way, the water main will connect to smaller diameter water lines of 30-inch, 24-inch, 16-inch, 12-inch and 8-inch.
Share Contractor has installed Water Line D on FacebookShare Contractor has installed Water Line D on TwitterShare Contractor has installed Water Line D on LinkedinEmail Contractor has installed Water Line D link
The Contractor has completed installing Water Line D. Water Line D is 16-inch diameter pipe and 2,250 linear feet in length and made of ductile iron.
Share Contractor to Mobilize on FacebookShare Contractor to Mobilize on TwitterShare Contractor to Mobilize on LinkedinEmail Contractor to Mobilize link
On March 27, 2023, the Contractor, Mountain Cascade of Texas, LLC, will begin to mobilize into the work area. Contractor will begin the construction staking, setup erosion control and setup temporary fencing.
Share Contract Award on FacebookShare Contract Award on TwitterShare Contract Award on LinkedinEmail Contract Award link
On December 13, 2022, The City of Denton awarded a contract to Mountain Cascade of Texas, LLC to construct the Northwest Water Transmission Main Project.