Elm and Locust Ph 2 Improvements

Share Elm and Locust Ph 2 Improvements on Facebook Share Elm and Locust Ph 2 Improvements on Twitter Share Elm and Locust Ph 2 Improvements on Linkedin Email Elm and Locust Ph 2 Improvements link

This project consists of full depth reconstruction of N Elm Street from W McKinney St to University Drive (US-380) and N Locust St from W McKinney St to University Drive (US-380). This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting.

This project consists of full depth reconstruction of N Elm Street from W McKinney St to University Drive (US-380) and N Locust St from W McKinney St to University Drive (US-380). This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting.

Ask the Project Manager

loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Page last updated: 30 Apr 2025, 09:53 AM