FM1515 (Airport Rd)
Water and Wastewater line relocation for TxDOT widening of Airport Road.
Water and Wastewater line relocation for TxDOT widening of Airport Road.
-
Bidding
Share Bidding on Facebook Share Bidding on Twitter Share Bidding on Linkedin Email Bidding linkBidding is open. Working with TxDOT on the agreement
-
Going Out to Bid
Share Going Out to Bid on Facebook Share Going Out to Bid on Twitter Share Going Out to Bid on Linkedin Email Going Out to Bid linkThis is using the pre-qualified list and will advertise for 30 days.
-
Nearing Bid Time
Share Nearing Bid Time on Facebook Share Nearing Bid Time on Twitter Share Nearing Bid Time on Linkedin Email Nearing Bid Time linkContinuing to get easements and working to get the bid out soon.
-
About to Bid Project
Share About to Bid Project on Facebook Share About to Bid Project on Twitter Share About to Bid Project on Linkedin Email About to Bid Project linkNeeding (3) easements still. Positive movement on acquiring the easements. Moving to get the contract out to bid.
-
Easements & Design
Share Easements & Design on Facebook Share Easements & Design on Twitter Share Easements & Design on Linkedin Email Easements & Design linkNeeding (3) easements for (1) crossing. We may evaluate if the project can be let without having these.
Project is at 100%, waiting to seal plans until ready to put contract out to bid.
-
Between 90% & 100% Design
Share Between 90% & 100% Design on Facebook Share Between 90% & 100% Design on Twitter Share Between 90% & 100% Design on Linkedin Email Between 90% & 100% Design linkThis project is between 90% and 100% Design. Working with TxDOT on the documentation needed as this is a reimbursable project. City Real Estate department is working on acquiring the needed easements.
-
90% Design Completed
Share 90% Design Completed on Facebook Share 90% Design Completed on Twitter Share 90% Design Completed on Linkedin Email 90% Design Completed linkWorking to get the easements needed and review of the 90% design.
-
60% Design Completed
Share 60% Design Completed on Facebook Share 60% Design Completed on Twitter Share 60% Design Completed on Linkedin Email 60% Design Completed link60% Completed on 5/2. Moving towards 90% design. TxDOT has reviewed the 60%, no conflicts identified.