This project consists of full depth reconstruction of 21 street segments within the NBHD-1A project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes limited sidewalk improvements, and street lighting. Following is a summary of key scope items:
Street Reconstruction – Approx. 8,000 linear feet
Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development
Sidewalks – Limited improvements as determined during design development
Streetlights – Limited improvements as determined by lighting study
The street segments include Meadow Lane Place, Meadow Lane, Plum Hollow Street, Tanglewood Street, Pheasant Hollow Street, Willow Stone Street, Pear Tree Place, Windbrook St., and Windbrook Court.
STREET SEGMENT
FROM
TO
STREET SEGMENT
FROM
TO
Meadow
Sagewood St
Meadow Lane Pl
Pheasant Hollow
Willow Stone
Brook Hollow E
Meadow
Pheasant Hollow St
Sagewood St
Pheasant Hollow
Plum Hollow
Willow Stone
Meadow
Meadow Lane Pl
Shadow Tr
Plum Hollow
Sagewood
Shadow Tr
Meadow Lane E
Hercules Ln
Meadow Ln
Plum Hollow
Locust N
Pheasant Hollow
Meadow Lane W
Hercules Ln
Meadow Ln
Tanglewood
Locust N
Pheasant Hollow
Pear Tree
Sagewood
Shadow Tr
Tanglewood
Sagewood
Shadow Tr
Pear Tree
Pheasant Hollow
Sagewood
Willow Stone
Sagewood
Shadow Tr
Pheasant Hollow
Meadow
Plum Hollow
Windbrook
Windbrook
North
Pheasant Hollow
Brook Hollow E
Pear Tree Pl
Windbrook
Pheasant Hollow
Windbrook Ct
Pheasant Hollow
Pear Tree Pl
Windbrook
Windbrook
Windbrook Ct
Shadow Tr
Willow Stone
Sagewood
Pheasant Hollow
This project consists of full depth reconstruction of 21 street segments within the NBHD-1A project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes limited sidewalk improvements, and street lighting. Following is a summary of key scope items:
Street Reconstruction – Approx. 8,000 linear feet
Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development
Sidewalks – Limited improvements as determined during design development
Streetlights – Limited improvements as determined by lighting study
The street segments include Meadow Lane Place, Meadow Lane, Plum Hollow Street, Tanglewood Street, Pheasant Hollow Street, Willow Stone Street, Pear Tree Place, Windbrook St., and Windbrook Court.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends