2019 Bond Neighborhood 1A

Share 2019 Bond Neighborhood 1A on Facebook Share 2019 Bond Neighborhood 1A on Twitter Share 2019 Bond Neighborhood 1A on Linkedin Email 2019 Bond Neighborhood 1A link

This project consists of full depth reconstruction of 21 street segments within the NBHD-1A project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes limited sidewalk improvements, and street lighting. Following is a summary of key scope items:

  • Street Reconstruction – Approx. 8,000 linear feet
  • Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development
  • Sidewalks – Limited improvements as determined during design development
  • Streetlights – Limited improvements as determined by lighting study




The street segments include Meadow Lane Place, Meadow Lane, Plum Hollow Street, Tanglewood Street, Pheasant Hollow Street, Willow Stone Street, Pear Tree Place, Windbrook St., and Windbrook Court.

STREET SEGMENT

FROM

TO

STREET SEGMENT

FROM

TO

Meadow

Sagewood St

Meadow Lane Pl

Pheasant Hollow

Willow Stone

Brook Hollow E

Meadow

Pheasant Hollow St

Sagewood St

Pheasant Hollow

Plum Hollow

Willow Stone

Meadow

Meadow Lane Pl

Shadow Tr

Plum Hollow

Sagewood

Shadow Tr

Meadow Lane E

Hercules Ln

Meadow Ln

Plum Hollow

Locust N

Pheasant Hollow

Meadow Lane W

Hercules Ln

Meadow Ln

Tanglewood

Locust N

Pheasant Hollow

Pear Tree

Sagewood

Shadow Tr

Tanglewood

Sagewood

Shadow Tr

Pear Tree

Pheasant Hollow

Sagewood

Willow Stone

Sagewood

Shadow Tr

Pheasant Hollow

Meadow

Plum Hollow

Windbrook

Windbrook

North

Pheasant Hollow

Brook Hollow E

Pear Tree Pl

Windbrook

Pheasant Hollow

Windbrook Ct

Pheasant Hollow

Pear Tree Pl

Windbrook

Windbrook

Windbrook Ct

Shadow Tr


Willow Stone

Sagewood

Pheasant Hollow



This project consists of full depth reconstruction of 21 street segments within the NBHD-1A project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes limited sidewalk improvements, and street lighting. Following is a summary of key scope items:

  • Street Reconstruction – Approx. 8,000 linear feet
  • Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development
  • Sidewalks – Limited improvements as determined during design development
  • Streetlights – Limited improvements as determined by lighting study




The street segments include Meadow Lane Place, Meadow Lane, Plum Hollow Street, Tanglewood Street, Pheasant Hollow Street, Willow Stone Street, Pear Tree Place, Windbrook St., and Windbrook Court.

STREET SEGMENT

FROM

TO

STREET SEGMENT

FROM

TO

Meadow

Sagewood St

Meadow Lane Pl

Pheasant Hollow

Willow Stone

Brook Hollow E

Meadow

Pheasant Hollow St

Sagewood St

Pheasant Hollow

Plum Hollow

Willow Stone

Meadow

Meadow Lane Pl

Shadow Tr

Plum Hollow

Sagewood

Shadow Tr

Meadow Lane E

Hercules Ln

Meadow Ln

Plum Hollow

Locust N

Pheasant Hollow

Meadow Lane W

Hercules Ln

Meadow Ln

Tanglewood

Locust N

Pheasant Hollow

Pear Tree

Sagewood

Shadow Tr

Tanglewood

Sagewood

Shadow Tr

Pear Tree

Pheasant Hollow

Sagewood

Willow Stone

Sagewood

Shadow Tr

Pheasant Hollow

Meadow

Plum Hollow

Windbrook

Windbrook

North

Pheasant Hollow

Brook Hollow E

Pear Tree Pl

Windbrook

Pheasant Hollow

Windbrook Ct

Pheasant Hollow

Pear Tree Pl

Windbrook

Windbrook

Windbrook Ct

Shadow Tr


Willow Stone

Sagewood

Pheasant Hollow