2019 Bond Neighborhood 4

Share 2019 Bond Neighborhood 4 on Facebook Share 2019 Bond Neighborhood 4 on Twitter Share 2019 Bond Neighborhood 4 on Linkedin Email 2019 Bond Neighborhood 4 link

This project consists of full depth reconstruction of 24 street segments within the NBHD-4 project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting. Following is a summary of key scope items:

  • Street Reconstruction – Approx. 8,700 linear feet
  • Public Water Line Replacement – Approx. 7,000 linear feet (including service connections)
  • Public Sanitary Sewer Line Replacement – Approx. 5,800 linear feet (including service connections)
  • Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development.
  • Sidewalks – Limited improvements as determined during design development
  • Streetlights – Limited improvements as determined by lighting study





The street segments include:

STREET SEGMENT

FROM

TO

STREET SEGMENT

FROM

TO

Brightwood

Wilsonwood Dr

Longfellow Ln

Dunes Pl

Dunes St

S Culdesac

Broken Arrow

Dunes St

Old Orchard Ln

Jamestown

Williamsburg Rw

Mistywood Ln

Broken Bow

Dunes St

Windsor Dr E

Jamestown

Maid Marion Pl

Williamsburg Rw

Broken Bow

Windsor Dr

North

Jamestown

Locksley Ln

Maid Marion Pl

Chaparral

Cooper Branch E

East

Maid Marian

Jamestown Ln

Locksley Ln

Churchill

Wellington Dr

Windsor Dr E

Mill Pond

Emerson Ln

Old North Rd

Churchill

Churchill Cr

Wellington Dr

Old Orchard

Dunes St

Broken Arrow Rd

Churchill

Churchill Cir

Churchill Dr

Old Orchard

Dunes St

S Culdesac

Churchill

Wellington Dr

Churchill Dr

Old Orchard

Windsor Dr E

Broken Arrow Rd

Dunes

Broken Bow Rd

Old Orchard Ln

Pickwick

Oxford Ct

Windsor Dr E

Dunes

Old Orchard Ln

Dunes Pl

Wellington

Churchill Cr

Heather Ln

Dunes

Dunes Pl

Broken Arrow Rd

Wellington

Churchill Cr

Churchill Dr

This project consists of full depth reconstruction of 24 street segments within the NBHD-4 project area. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting. Following is a summary of key scope items:

  • Street Reconstruction – Approx. 8,700 linear feet
  • Public Water Line Replacement – Approx. 7,000 linear feet (including service connections)
  • Public Sanitary Sewer Line Replacement – Approx. 5,800 linear feet (including service connections)
  • Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development.
  • Sidewalks – Limited improvements as determined during design development
  • Streetlights – Limited improvements as determined by lighting study





The street segments include:

STREET SEGMENT

FROM

TO

STREET SEGMENT

FROM

TO

Brightwood

Wilsonwood Dr

Longfellow Ln

Dunes Pl

Dunes St

S Culdesac

Broken Arrow

Dunes St

Old Orchard Ln

Jamestown

Williamsburg Rw

Mistywood Ln

Broken Bow

Dunes St

Windsor Dr E

Jamestown

Maid Marion Pl

Williamsburg Rw

Broken Bow

Windsor Dr

North

Jamestown

Locksley Ln

Maid Marion Pl

Chaparral

Cooper Branch E

East

Maid Marian

Jamestown Ln

Locksley Ln

Churchill

Wellington Dr

Windsor Dr E

Mill Pond

Emerson Ln

Old North Rd

Churchill

Churchill Cr

Wellington Dr

Old Orchard

Dunes St

Broken Arrow Rd

Churchill

Churchill Cir

Churchill Dr

Old Orchard

Dunes St

S Culdesac

Churchill

Wellington Dr

Churchill Dr

Old Orchard

Windsor Dr E

Broken Arrow Rd

Dunes

Broken Bow Rd

Old Orchard Ln

Pickwick

Oxford Ct

Windsor Dr E

Dunes

Old Orchard Ln

Dunes Pl

Wellington

Churchill Cr

Heather Ln

Dunes

Dunes Pl

Broken Arrow Rd

Wellington

Churchill Cr

Churchill Dr

  • Neighborhood 4 Public Meeting for Construction Kickoff

    Share Neighborhood 4 Public Meeting for Construction Kickoff on Facebook Share Neighborhood 4 Public Meeting for Construction Kickoff on Twitter Share Neighborhood 4 Public Meeting for Construction Kickoff on Linkedin Email Neighborhood 4 Public Meeting for Construction Kickoff link

    The Construction Kickoff Public Meeting was held on June 22nd.

    If you were unable to attend the meeting please click on the photo below to watch the recorded presentation.

  • Notice of Community Meeting

    Share Notice of Community Meeting on Facebook Share Notice of Community Meeting on Twitter Share Notice of Community Meeting on Linkedin Email Notice of Community Meeting link

    The City of Denton will hold a Virtual Community Meeting at 6pm on Thursday, June 22, regarding street improvements in the Neighborhood 4 area.

    Click Here to sign up for the Virtual Meeting

  • Project Update

    Share Project Update on Facebook Share Project Update on Twitter Share Project Update on Linkedin Email Project Update link

    The contract has been awarded to the contractor and the City will host a virtual community meeting. Once a date is selected for the virtual community meeting, a sign up link will be posted in another project update on this page.

  • Project Update

    Share Project Update on Facebook Share Project Update on Twitter Share Project Update on Linkedin Email Project Update link

    2019 Street Bond Neighborhood 4 project is on schedule to go to City Council on 5/2/23 to award the project to the construction contractor. Once approved, the construction schedule can be finalized including the start and finish date.

  • Project Update

    Share Project Update on Facebook Share Project Update on Twitter Share Project Update on Linkedin Email Project Update link

    2019 Street Bond Neighborhood 4 project is currently on schedule and anticipated to go to Public Utility Board on 4/24/23.

  • Project Update

    Share Project Update on Facebook Share Project Update on Twitter Share Project Update on Linkedin Email Project Update link

    2019 Street Bond Neighborhood 4 project is currently advertising and scheduled for a bid opening on 2/22/23.

  • Project Timeline

    Share Project Timeline on Facebook Share Project Timeline on Twitter Share Project Timeline on Linkedin Email Project Timeline link
    supporting image


    • Final Design Complete -Q1 2023
    • Estimated Advertising – Q1 2023
    • Estimated Construction Contract Awarded – Q2 2023
    • Estimated Construction – Q3 2023 thru Q4 2024
    • Estimated Project Closeout – Q1 2025
Page last updated: 01 Apr 2024, 12:45 PM