This project consists of full depth reconstruction of 17 street segments within the NBHD-5B project area and the upgrade of drainage system under Oakland Street (Pecan Creek) with the installation of a new detention pond. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting.
Approx. 8,400 linear feet
Public Water Line Replacement – Approx. 4,900 linear feet (including service connections)
Public Sanitary Sewer Line Replacement – Approx. 2,715 linear feet
Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development.
Sidewalks – Limited improvements as determined during design development
Streetlights – Limited improvements as determined by lighting study
This project consists of full depth reconstruction of 17 street segments within the NBHD-5B project area and the upgrade of drainage system under Oakland Street (Pecan Creek) with the installation of a new detention pond. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting.
Approx. 8,400 linear feet
Public Water Line Replacement – Approx. 4,900 linear feet (including service connections)
Public Sanitary Sewer Line Replacement – Approx. 2,715 linear feet
Stormwater Infrastructure Replacement – Serious Stormwater Infrastructure deficiencies will be addressed during design development.
Sidewalks – Limited improvements as determined during design development
Streetlights – Limited improvements as determined by lighting study