Northwest Water Transmission Main

Share Northwest Water Transmission Main on Facebook Share Northwest Water Transmission Main on Twitter Share Northwest Water Transmission Main on Linkedin Email Northwest Water Transmission Main link

The Northwest Water Transmission Main Project is identified within the City of Denton Water Distribution Master Plan. The transmission main will serve to efficiently deliver water from the 2.0 MG Riney Road Elevated Storage Tank to the 1.0 MG Northwest Elevated Storage Tank. As community development continues towards the northwest, the water transmission main will ensure water quality standards are met and reduce the tank fill time of the Northwest Elevated Storage Tank.


The project will consist of the construction of nearly 2 miles of 36-inch water main along the designated project alignment. Along the way, the water main will connect to smaller diameter water lines of 30-inch, 24-inch, 16-inch, 12-inch and 8-inch.

The Northwest Water Transmission Main Project is identified within the City of Denton Water Distribution Master Plan. The transmission main will serve to efficiently deliver water from the 2.0 MG Riney Road Elevated Storage Tank to the 1.0 MG Northwest Elevated Storage Tank. As community development continues towards the northwest, the water transmission main will ensure water quality standards are met and reduce the tank fill time of the Northwest Elevated Storage Tank.


The project will consist of the construction of nearly 2 miles of 36-inch water main along the designated project alignment. Along the way, the water main will connect to smaller diameter water lines of 30-inch, 24-inch, 16-inch, 12-inch and 8-inch.

  • Electrical Meter has been requested from DME.

    Share Electrical Meter has been requested from DME. on Facebook Share Electrical Meter has been requested from DME. on Twitter Share Electrical Meter has been requested from DME. on Linkedin Email Electrical Meter has been requested from DME. link

    The Water Department has requested a meter be placed at the site of cathodic protection for the new 36-inch transmission water line. The cathodic system protects the new water line from corrosion.

  • Punchlist Items being completed by Contractor

    Share Punchlist Items being completed by Contractor on Facebook Share Punchlist Items being completed by Contractor on Twitter Share Punchlist Items being completed by Contractor on Linkedin Email Punchlist Items being completed by Contractor link

    After the completion of the walk-thru, the Contractor has been busy completing the items identified as needing correction.

  • Final Walk-Through has been scheduled!

    Share Final Walk-Through has been scheduled! on Facebook Share Final Walk-Through has been scheduled! on Twitter Share Final Walk-Through has been scheduled! on Linkedin Email Final Walk-Through has been scheduled! link

    The Contract, Engineer, Public Works Inspectors and Project Manager will conduct a final walk-through from one project limit to another. Items that are found during the Walk-Through are placed on the "Punchlist" for the Contractor to complete before the project can be considered complete.

  • Construction Project is 98% complete

    Share Construction Project is 98% complete on Facebook Share Construction Project is 98% complete on Twitter Share Construction Project is 98% complete on Linkedin Email Construction Project is 98% complete link

    Construction Project is 98% complete. Contractor is working on site restoration and site cleanup.

  • Construction Project is 93% complete!

    Share Construction Project is 93% complete! on Facebook Share Construction Project is 93% complete! on Twitter Share Construction Project is 93% complete! on Linkedin Email Construction Project is 93% complete! link

    The construction project is nearing completion. Work crews are coordinating with the Water Department to prepare for the final two waterline tie-ins.

  • Three water line tie-ins completed in March and April of 2024!

    Share Three water line tie-ins completed in March and April of 2024! on Facebook Share Three water line tie-ins completed in March and April of 2024! on Twitter Share Three water line tie-ins completed in March and April of 2024! on Linkedin Email Three water line tie-ins completed in March and April of 2024! link

    The Contractor successfully tied in the new Northwest Water Transmission Line at (3) key locations. Coordination between the City of Krum, City of Sanger, the Water Department and the Contractor to accomplish the task at hand.

  • The Construction Project is 80% complete.

    Share The Construction Project is 80% complete. on Facebook Share The Construction Project is 80% complete. on Twitter Share The Construction Project is 80% complete. on Linkedin Email The Construction Project is 80% complete. link

    Mountain Cascade of Texas continues to install the transmission water line is now 80% complete with the project.

  • First Coordination Meeting to discuss water shutdowns and tie-ins held this week.

    Share First Coordination Meeting to discuss water shutdowns and tie-ins held this week. on Facebook Share First Coordination Meeting to discuss water shutdowns and tie-ins held this week. on Twitter Share First Coordination Meeting to discuss water shutdowns and tie-ins held this week. on Linkedin Email First Coordination Meeting to discuss water shutdowns and tie-ins held this week. link

    Consultant Engineer held the first coordination meeting to discuss the upcoming water shutdowns and tie-ins affecting the City of Krum and City of Sanger feeds.

  • The installation of the main distribution waterline continues.

    Share The installation of the main distribution waterline continues. on Facebook Share The installation of the main distribution waterline continues. on Twitter Share The installation of the main distribution waterline continues. on Linkedin Email The installation of the main distribution waterline continues. link

    The Contractor continues to install the 36-inch water line. The project is now approximately 60% complete.

  • Contractor is installing the main distribution line.

    Share Contractor is installing the main distribution line. on Facebook Share Contractor is installing the main distribution line. on Twitter Share Contractor is installing the main distribution line. on Linkedin Email Contractor is installing the main distribution line. link

    The Contractor is in the process of installing the main distribution line along Loop 288 & US 77. The project is 30% complete.

Page last updated: 03 Oct 2024, 12:41 PM